Publication

Working ABE Manuscripts: All But Editorial work  

  • Choi, K., Bae, J., and Lee, H.W. (2014). “Modeling Cost-Time Interdependence for Innovating Contracting Projects: Are They Really Effective?” Journal of Construction Engineering and Management, ASCE. 

  • Lee, H.W., Oh, H., Kim, Y., and Choi, K(2014). “Analysis of Warnings in Building Information Modeling.” Automation in Construction, Elsevier. 

  • Choi, K., Kim, Y.H., and Bae, J. (2014). “Determining Future Maintenance Cost for Low-Volume Highway Rehabilitation Projects.” Journal of Construction Engineering and Management, ASCE. 

  • Choi, K., and Bae, J. (2014). “Quantifying the Impact of Change Orders on Project Cost and Time.” Journal of Construction Engineering and Management, ASCE.

  • Choi, K., Bae, J., Bilbo, D. (2014). “Cost Effectiveness of Highway Innovative Contracting Projects.” Journal of Construction Engineering and Management, ASCE.

  • Choi, K., and Lee, H.W. (2014). “Deconstructing the Construction Industry by Profitability: Modeling Critical Performance-Driven Factors.” Journal of Construction Engineering and Management, ASCE.

Working PMS Manuscripts: Progress Made towards Submission

  • Choi, K., Bae, J., Ryu, K., and Han, N. (2014). “Time-Cost Performance Effects of Design-Build and Innovative Contracting Projects on Change Order Frequency and Occurrence Timing.” Journal of Construction Engineering and Management, ASCE.

  • Choi, Kand Kwak, Y.H. (2014). “Quantification of Contractors’ Additional Cost of Acceleration.” Journal of Computing in Civil Engineering, ASCE.

  • Choi, K., Shashank, T., and Bae, J. (2014). “Estimating Road User Cost with Heterogeneous Value of Traveler’s Time.” Journal of Computing in Civil Engineering, ASCE.

  • Choi, K. (2014). “Decision-Support Framework of Optimal Incentives/Disincentives.” International Journal of Project Management, Elsevier.

  • Bae, J., Choi, K., Chung, K. (2014). “Spatiotemporal Traffic Data Summarization and Characterization.” Journal of Computing in Civil Engineering, ASCE.

Refereed Archival Journal Publications

  • Lee, H.W., Choi, K., and Gambatese, J.A. (2014). "Real Options Valuation of Phased Investments in Commercial Energy Retrofits under Building Performance Risks." Journal of Construction Engineering and Management, ASCE, accepted for publication, in press. 

  • Choi, K., Lee, H.W., Mao, Z., Lavy, S., and Ryoo, B.Y. (2013). "Life-Cycle Assessment of Highway Rigid Pavement Rehabilitation Alternatives: Environmental, Economic, and Social Implications." Journal of Construction Engineering and Management, ASCE, under re-review.  

  • Choi, K., Haque, M., Lee, H., Cho, Y., and Kwak, Y.H. (2013). “Macroeconomic Labor Productivity and Its Impact on Firm’s Profitability.” Journal of The Operational Research Society (Special Issue on Construction Management), Palgrave Macmillan, 2013 (64), 1258-1268.

  • Cho, Y., Kabassi, K., Pyeon, J., Choi, K., and Wang, C. (2013). “Effectiveness Study of Temporary Pavement Markings Removal Methods in Roadway Construction Zones.” Journal of Construction Engineering and Management, ASCE, 139 (3), 257-266.

  • Choi, K., Kwak, Y.H. (2012). “Decision-Support Model for Incentives/Disincentives Time-Cost Tradeoff.” Automation in Construction, Elsevier, 21 (2012), 219-228.    
                                                                          
  • Choi, K., Kwak, Y.H., Pyeon, J., and Son, K. (2012). “Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects.” Journal of Construction Engineering and Management, ASCE, 138 (3), 323-330.

  • Choi, K., Son, K., Woods, P., and Park, Y. (2012). “LEED Public Transportation Accessibility and Its Economic Implications.” Journal of Construction Engineering and Management, ASCE, 138 (9), 1095-1102.

  • Son, K., Choi, K., Woods, P., and Park, Y. (2012). “Urban Sustainability Predictive Model Using GIS: Appraised Land Value versus LEED Sustainable Site Credits.” Journal of Construction Engineering and Management, ASCE, 138 (9), 1107-1112.

  • Kim, Y., Han, S., Shin, S., and Choi, K. (2011). “A Case Study of Activity-Based Costing in Allocating Rebar Fabrication Costs to Projects.” Journal of Construction Management and Economics, Taylor & Francis, 29 (5), 449-461.

  • Choi, K., Lee, E., Ibbs, C.W., and Kim, Y. (2009). “Multifaceted Public Outreach and Cost-Benefit Analysis for Its Effectiveness Validation.” Journal of Construction Management and Economics, Taylor & Francis, 27 (8), 771- 782. 

  • Lee, E., Choi, K., and Lim, D.S. (2008). “Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks.” Transportation Research Record: Journal of the Transportation Research Board, No. 2081, TRB, National Research Council, Washington, D.C., 38-45.

  • Lee, E. and Choi, K. (2006). “Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network.” Transportation Research Record: Journal of the Transportation Research Board, No. 1949, TRB, National Research Council, Washington, D.C., 3-10.      

Refereed Conference Proceedings

  • Lee, H.W., Choi, K., Gambatese, J., and Kim, D. (2014). "Financial Valuation Framework for Commercial Energy Retrofits under Private Risks." 2014 Construction Research Congress, Atlanta, GA, May 19-21.  

  • Choi, K., Ryoo, B.Y., and Kwak, Y.H. (2013). “Cluster-Driven Life-Cycle Cost Analysis Model for Transportation Infrastructure Improvement Projects.” UKC 2013, East Rutherford, NJ, August 7-11. 

  • Ryoo, B.Y., and Choi, K. (2013). “Integrating Project Management with IT for Corporate Portfolio Management Solutions.” UKC 2013, East Rutherford, NJ, August 7-11. 

  • Lee, H.W., Kim, Y., Kim, D., and Choi, K. (2013). "LEED Perception Disparities: Designers Versus Non-Designers." The 5th International Conference on Construction Engineering and Project Management, Anaheim, CA, January 9-11.  

  • Choi, K., and Kim, S.H. (2012). “Automating Spatiotemporal Work Zone Impact Analysis Required for Critical Civil Transportation Projects.” UKC 2012, Los Angeles, CA, August 8-11. 

  • Choi, K., Chung, K., Park, E.S., and Pyeon, J. (2011). “Stochastic Modeling for Quantifying Optimal Incentive Amounts of Early Project Completion.” The 28th International Symposium on Automation and Robotics in Construction, Seoul, South Korea, June 29 – July 2.

  • Pyeon, J., Choi, K., Park, M., and Kim, S. (2011). “Simulation Model to Predict Project Time and Cost Performance of Incentive/Disincentive Construction Projects.” The 28th International Symposium on Automation and Robotics in Construction, Seoul, South Korea, June 29 – July 2.

  • Choi, K., Lee, E.B., Kwak, Y.H., and Pyeon, J.H. (2011). “Optimal Incentive/Disincentive Predictive Model for Transportation Projects.” 2nd International Conference on Transportation Construction Management, Federal Highway Administration, Orlando, FL, February 7-10.  
       
  • Ellis, R., Pyeon, J.H., and Choi, K. (2011). “Pit Proctor Utilization for Construction of Pavement Base Materials in the FDOT Construction Process.” 2nd International Conference on Transportation Construction Management, Federal Highway Administration, Orlando, FL, February 7-10.
        
  • Choi, K., Kwak, Y.H., and Yu, B. (2010). “Quantitative Model for Determining Incentive/Disincentive Amounts through Schedule Simulations.” 2010 Winter Simulation Conference, Institute of Electrical and Electronics Engineers (IEEE), Baltimore, MD, December 5-8.

  • Kwak, Y.H., Choi, K., and Park, J. (2010). “Implications of Change Orders on Project Schedule and Cost.” Informs 2010 Annual Meeting, Institute for Operations Research and the Management Sciences, Austin, TX, November 7-10.

  • Choi, K., Ibbs, C.W., Pyeon, J. (2010). “Alternative Contracting Strategies: Are They Really Effective?” The 4th International Conference of Public Procurement (IPPC2010), Seoul, South Korea, August 26-28.

  • Choi, K. (2009). “A State-of-the-art Tool for Sustainable Rebuilding of Aging Infrastructure Systems.” 2009 American Society of Engineering Education Mid-Atlantic Conference, King of Prussia, Pennsylvania, October 23-24. 

  • Choi, K. and Lee, E.B. (2009). “Quantitative Analysis on Aspects of Project Performance.” 2009 United State-Korea Scientists Conference (UKC 2009), Raleigh, North Carolina, July 16-19. 

  • Lee, E.B., Choi, K., and Harvey, J.T. (2006). “Productivity Issues and Lessons-Learned From Two Long-Life Urban Freeway Concrete Rehabilitation Projects in California.” International Conference on Long-Life Concrete Pavements, Federal Highway Administration, Chicago, Illinois, October 24-27.

  • Lee, E.B. and Choi, K. (2006). “Innovative Fast-Track Approach to Concrete Pavement Rehabilitation in Urban Highway Network.” Paper No. 15359, Airfield and Highway Pavements Meeting Today's Challenges with Emerging Technologies, ASCE, Atlanta, Georgia, April 30- May 3.

  • Lee, E.B., and Choi, K. (2006). “Dynamic Approach to Public Outreach for Minimizing Traffic Inconvenience in Urban Highway Rehabilitation.” Preprints of the Transportation Research Board 85th Annual Meeting (CD-ROM: paper no: 06-1817), Transportation Research Board, TRB, National Research Council, Washington, D.C.

  •  Lee, E.B., Harvey, J.T., Choi, K., and Thomas, K.D. (2005). “Innovative Approach to Rapid Rehabilitation of Highway Concrete Pavement under High-traffic Volumes.” International Society for Concrete Pavements, International Conference on Concrete Pavements, Colorado Springs, Colorado, Aug. 14-18.


Research Reports                                                   

  • Ettelman, B., Bricka, S., Choi, K., Geiselbrecht, T., Miller, K., Joh, K., and Wagner, J. (2013). “Exploring New Technology: Results of the Oak Hill Parkway Virtual Open House Pilot.” Final Technical Report prepared for the Texas Transportation Commission and the 83rd Texas Legislature, Texas A&M Transportation Institute, College Station, TX. 

  • Choi, K., Park, E.S., Bae, J. (2013). “Decision-Support Framework for Quantifying the Most Economical Incentive/Disincentive Dollar Amounts for Critical Highway Pavement Rehabilitation Projects.” Final Technical Report, Southwest Region University Transportation Center, Texas A&M Transportation Institute, College Station, TX. 

  • Choi, K. (2008). “Innovative Contracting Methods Implementation Studies.” Research Report, Division of Research and Innovation, California Department of Transportation, Sacramento, CA.

  • Lee, E.B., Harvey, J.T., and Choi, K. (2006). “Innovative Fast-Track Approach to Minimizing Public Inconvenience in Heavily Trafficked Urban Highway Rehabilitation.” Technical Report, California Department of Transportation, Sacramento, CA.

  • Lee, E.B., Choi, K., and Harvey, J.T. (2005). “Pre- and Postconstruction Analysis of the Interstate 15 (Devore) Concrete Rehabilitation Project.” Research Report (UCPRC-RR-2005-14), Office of Roadway Research, Division of Research and Innovation, California Department of Transportation, Sacramento, CA.  


 Copyright @ 2013 Professor Kunhee CHOI All Rights Reserved.